A Method for Identifying Critical Success Factors of JIT Implementation in Different Circumstances
Published: 2012
Author(s) Name: Hassan Farsijani, Yasser Sobhani Fard, Maryam Akhavan Kharazian, Mohsen Shafiei Nikabadi
Locked
Subscribed
Available for All
Abstract
World Class Manufacturing is a management philosophy that emphasizes on meeting external and internal customers’ needs and
expectations and importance of doing things right for world market society. One of the most world class production techniques is
Just in Time (JIT). JIT production system has some components that need to implement it. Researches show that implementation
of this system isn’t unique in all time, places and circumstances. Implementation of this system may be differed from one company
to another and the components those are needed to a company may not be necessary in another company. The purpose of this
study is to introduce a mathematical method for identifying elements and components that are critical for JIT success in different
circumstances. The study recommends this method by using TOPSIS and Pareto techniques. We use TOPSIS and Pareto
techniques for setting a priority and thereby selection of component and use entropy method for giving coefficient to TOPSIS
matrix. In this process, the statistical population to answer these questions is 1500 of the company’s managers and engineers as
experts in appliance industry of Iran. In this case we have extracted 5 components from 11 possible components in this system to
implement in these companies (in appliance industry).The components for JIT implementation are different in different industries
and companies. In a scene, while JIT implementation flow the logical priorities as an algorithm, it can perform regarding to its
circumstances, readiness and needs. Concerning these circumstances, readiness and needs, these components of JIT must
be implemented with priority in these companies: JIT supplier management, Preventive maintenance, set up time reduction, Lot
sizing, Pull production system.
Keywords: World Class Manufacturing, Just in Time, TOPSIS method, Pareto technique, Entropy method.
View PDF