Competency Level of Manpower and Its Impact on the Success of a Wire Line Telecom Project, Indian Scenario
Published: 2012
Author(s) Name: Ramesh C. Raina, Dr. Pratibha Goyal
Locked
Subscribed
Available for All
Abstract
Telecommunication Industry in India is growing fast. The
performance Indicators released by (TRAI, Nov 2009), are
encouraging. In India currently there are 525.65 million
telephone subscribers. The teledensity recorded ending oct
2009 was 44.87.Out of 525.65 million subscribers 488.40
million subscribers have subscribed wireless services and
37.25 million wire line services. The subscriber base for
wireline is on decresing trend. The Study was conducted
for wireline segment.In the study it was found out that due
to various issues related to Quality, Deliverables, Time and
cost over runs; there is a decreasing trend in the subscriber
base. It was also found out that Competence Level of
manpower has great Impact on the success of a wireline
telecommunication Project. Since Telecommunication
Service providers outsource network construction, Service
delivery, service assurance to vendors, success mostly
depends upon the competence level of the manpower
working for that project. The mathematical model suggests
that Skill sets of the manpower have the maximum impact
on the Project deliverables, Time over runs and cost over
runs. Another mathematical model suggests that for
Quality, it is not only skill sets or attitude but Knowledge
also has the maximum impact. Correlation analysis
between Competence level of manpower and Project
success has come to be 0.23 which is positive but its degree
of association is very weak. It may be concluded that in
addition to manpower competency other resources like
Machines, Materials and Money play important role in the
success story of a wire line telecommunication Project.
Training and development programs for vendor
manpower should be top priority for the vendors as well as
the the Telecommunication service provider.
View PDF