The Aim of project is to find the Productivity for finishing works in the Construction Industry and suggest some ideas to overcome the delaying factors. In this project, we include safety induction, planning, and finishing activities work procedure, quality control, productivity and rate analysis. Every organization requires more productivity which increase their profit, quality and to reduce cost and time. Therefore, we have collected productivity data for certain finishing activities (Block Works, Cement Plastering,) from the industry for 30 working days. We could also able to learn the importance of Safety both inside and outside the site through the video screened and the Safety Practices by the Industry. From the Quality Control we have learnt the test to be carried out for different materials and works.
Locked
Subscribed
Open Access